Afsluitdijk Dam Modernization and Gujarat's Kalpasar Project
Sector: Hydro • Location: Gujarat, India and Netherlands
Source: Adda247
The Afsluitdijk is a 32-kilometre long barrier dam in the Netherlands, separating the North Sea from the IJsselmeer freshwater lake, serving multiple functions including flood protection, freshwater storage, inland water transport, climate resilience, renewable energy integration, and ecological conservation. The Netherlands is modernizing the dam through the Afsluitdijk 2.0 project, which include
- Status
- Prospective
- Sector
- Hydro, Aerospace & Defense, Solar, Government, Water Supply and Storage, Manufacturing (Industrial)
- Location
- Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Adda247
ConstructChat
Ask ConstructChat about Afsluitdijk Dam Modernization and Gujarat's Kalpasar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Afsluitdijk is a 32-kilometre long barrier dam in the Netherlands, separating the North Sea from the IJsselmeer freshwater lake, serving multiple functions including flood protection, freshwater storage, inland water transport, climate resilience, renewable energy integration, and ecological conservation. The Netherlands is modernizing the dam through the Afsluitdijk 2.0 project, which includes stronger flood barriers, advanced water discharge technology, storm defense systems, fish migration channels, and solar and tidal renewable energy systems, with an investment of nearly €800 million. India is studying the Dutch water model to inform Gujarat's ambitious Kalpasar Project, which aims to build a giant dam across the Gulf of Khambhat to create a massive freshwater reservoir by capturing river water before it reaches the sea. The Kalpasar Project plans a dam nearly 30 kilometres long to store around 10 billion cubic metres of freshwater, supporting drinking water supply, irrigation, industrial water demand, flood management, and transport connectivity. The project faces challenges including environmental impact, marine ecosystem disruption, fisheries impact, sedimentation risks, navigation challenges, and long-term sustainability, with an estimated cost exceeding ₹85,000 crore and a construction period potentially over a decade. |
Original sector | Water Management |
Budget |
Location
Country | India |
State | Gujarat |
Source
Source | Adda247 |
URL |
More Details
Record type | Project |
Sector | Hydro, Aerospace & Defense, Solar, Government, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
