Agadir Desalination Plant Expansion
One of 4,228 projects Taiyo tracks in Morocco.
Source: Wiss Now
The Agadir desalination plant in Morocco is undergoing a major expansion to increase its production capacity to 400,000 cubic meters of water per day. The project integrates renewable energy from AMEA Power's 150 MW wind farm in Laayoune to power the desalination process, reducing carbon footprint and enhancing sustainability. The expansion is part of a joint venture between Cox and AMEA Power, wi
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Raw Materials, Wind, Waste Processing and Treatment, Water Supply and Storage
- Location
- Agadir, Morocco
- Updated
- 22 Jul 2026
- Source
- Wiss Now
ConstructChat
Ask ConstructChat about Agadir Desalination Plant Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Agadir desalination plant in Morocco is undergoing a major expansion to increase its production capacity to 400,000 cubic meters of water per day. The project integrates renewable energy from AMEA Power's 150 MW wind farm in Laayoune to power the desalination process, reducing carbon footprint and enhancing sustainability. The expansion is part of a joint venture between Cox and AMEA Power, with a combined investment exceeding €250 million. The desalination plant expansion is scheduled to be operational by the end of 2026, with the wind farm coming online in 2027. |
Original sector | Water and Energy |
Budget |
Location
Country | Morocco |
City | Agadir |
Source
Source | Wiss Now |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Raw Materials, Wind, Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
