logo

Agassiz Transmission Line and Substation

Sector: Power Transmission • Location: Fargo, North Dakota, United States

Source: The Dakotan

Project
Planned

Applied Digital is investing $75 million in power system upgrades in eastern North Dakota, including an electrical substation and a 345-kilowatt high-voltage powerline near Interstate 29 between Fargo and Harwood. Minnkota Power Cooperative will own and operate the new facilities, which will provide power to the Applied Digital data center under construction. The project aims to support the data c

Status
Prospective
Sector
Power Transmission, Data Center, Power Generation (CCGT)
Location
Fargo, North Dakota, United States of America
Updated
22 Jul 2026
Source
The Dakotan

ConstructChat

Ask ConstructChat about Agassiz Transmission Line and Substation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Agassiz Transmission Line and Substation” is an infrastructure initiative in the Power Transmission sector, located in Fargo, North Dakota, United States. Taiyo aggregates data on it from The Dakotan.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Applied Digital is investing $75 million in power system upgrades in eastern North Dakota, including an electrical substation and a 345-kilowatt high-voltage powerline near Interstate 29 between Fargo and Harwood. Minnkota Power Cooperative will own and operate the new facilities, which will provide power to the Applied Digital data center under construction. The project aims to support the data center's large power needs and benefit the regional power grid.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

North Dakota

City

Fargo

Source

Source

The Dakotan

URL

More Details

Record type

Project

Sector

Power Transmission, Data Center, Power Generation (CCGT)

Article published date

2026-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project