Agassiz Transmission Line and Substation
Sector: Data Center • Location: Fargo, North Dakota, United States
Source: North Dakota Monitor
The project involves constructing a 345-kilowatt powerline about 1.74 miles long and a substation east of Interstate 29 near a data center north of Fargo, North Dakota. The powerline will connect to existing powerlines west and south of the substation. The project is needed to supply 280 megawatts of power at peak demand to the data center being built between Fargo and Harwood.
- Status
- Prospective
- Sector
- Data Center, Power Generation (CCGT)
- Location
- Fargo, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- North Dakota Monitor
ConstructChat
Ask ConstructChat about Agassiz Transmission Line and Substation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves constructing a 345-kilowatt powerline about 1.74 miles long and a substation east of Interstate 29 near a data center north of Fargo, North Dakota. The powerline will connect to existing powerlines west and south of the substation. The project is needed to supply 280 megawatts of power at peak demand to the data center being built between Fargo and Harwood. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Fargo |
Source
Source | North Dakota Monitor |
URL |
More Details
Record type | Project |
Sector | Data Center, Power Generation (CCGT) |
Article published date | 2026-04-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
