logo

Agave Battery Energy Storage System (BESS) Phase 1

Sector: Solar • Location: Arizona, United States

Source: Energy-Storage.News

Project
Planned

The Agave BESS Phase 1 project is a 150MW/600MWh battery energy storage system co-located with an existing solar PV plant. It aims to provide grid stabilization, peak shaving, and renewable load shifting, supported by a conditional loan from the US Department of Energy.

Status
Prospective
Sector
Solar, Power Transmission, Power Generation (CCGT), Energy Storage
Location
Arizona, United States of America
Updated
22 Jul 2026
Source
Energy-Storage.News

ConstructChat

Ask ConstructChat about Agave Battery Energy Storage System (BESS) Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Agave Battery Energy Storage System (BESS) Phase 1” is an infrastructure initiative in the Solar sector, located in Arizona, United States. Taiyo aggregates data on it from Energy-Storage.News.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Agave BESS Phase 1 project is a 150MW/600MWh battery energy storage system co-located with an existing solar PV plant. It aims to provide grid stabilization, peak shaving, and renewable load shifting, supported by a conditional loan from the US Department of Energy.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Arizona

Source

Source

Energy-Storage.News

URL

More Details

Record type

Project

Sector

Solar, Power Transmission, Power Generation (CCGT), Energy Storage

Article published date

2025-01-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project