Aggreko 14 MW Temporary Power Plant
Sector: Water Supply and Storage • Location: Gabon
Source: World Bank Group
In 2004, Aggreko Plc was awared a rental contract to supply 14MW for peak production and to allow for scheduled maintenance of SEEG’s hydro-dams.
As of June 2007, the 14MW power plant was still operational due to the continued lack of hydro-power in country. Lack of information.
- Status
- Prospective
- Sector
- Water Supply and Storage, Hydro, Power Generation (CCGT), Government
- Location
- Gabon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Aggreko 14 MW Temporary Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 2004, Aggreko Plc was awared a rental contract to supply 14MW for peak production and to allow for scheduled maintenance of SEEG’s hydro-dams. As of June 2007, the 14MW power plant was still operational due to the continued lack of hydro-power in country. Lack of information. |
Original sector | Energy |
Location
Country | Gabon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Power Generation (CCGT), Government |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
