Aggreko Bellevue and Owendo Power Plant
Sector: Power Transmission • Location: Gabon
Source: World Bank Group
In February 2007, Aggreko plc signed a rental contract with Société d'Energie et d’Eau du Gabon (SEEG) to supply 30MW of power to supplement the utility grid.
The additional power was installed across two sites, Bellevue and Owendo.
No information was disclosed on the length of the contract. Lack of information.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In February 2007, Aggreko plc signed a rental contract with Société d'Energie et d’Eau du Gabon (SEEG) to supply 30MW of power to supplement the utility grid. The additional power was installed across two sites, Bellevue and Owendo. No information was disclosed on the length of the contract. Lack of information. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
