logo

Aggreko Bellevue and Owendo Power Plant

Sector: Power Transmission • Location: Gabon

Source: World Bank Group

Project
Active

In February 2007, Aggreko plc signed a rental contract with Société d'Energie et d’Eau du Gabon (SEEG) to supply 30MW of power to supplement the utility grid.

The additional power was installed across two sites, Bellevue and Owendo.

No information was disclosed on the length of the contract. Lack of information.

Project Information FAQ

Project Information

4 Q
The project “Aggreko Bellevue and Owendo Power Plant” is an infrastructure initiative in the Power Transmission sector, located in Gabon. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In February 2007, Aggreko plc signed a rental contract with Société d'Energie et d’Eau du Gabon (SEEG) to supply 30MW of power to supplement the utility grid. The additional power was installed across two sites, Bellevue and Owendo. No information was disclosed on the length of the contract. Lack of information.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data