Aggreko Jinja Temporary Power Station

Sector: Power Generation (CCGT) • Location: Uganda

Source: World Bank Group

Project
Concluded

In the first half of 2006, the government of Uganda awarded a contract to Aggreko Plc for installation and operation of a 50 MW diesel-powered temporary power plant in Jinja, Uganda, to supply electricity to Uganda Electrical Transmission Company Ltd (UETCL). The contract period was for two years. The project became operational in late 2006. This contract was an addition to the 50 MW installed by

Project Information FAQ

Project Information

5 Q
The project “Aggreko Jinja Temporary Power Station” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Uganda. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Concluded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In the first half of 2006, the government of Uganda awarded a contract to Aggreko Plc for installation and operation of a 50 MW diesel-powered temporary power plant in Jinja, Uganda, to supply electricity to Uganda Electrical Transmission Company Ltd (UETCL). The contract period was for two years. The project became operational in late 2006. This contract was an addition to the 50 MW installed by Aggreko in 2005. This meant that the Aggreko supplied an estimated 40% of the country’s total grid capacity. In addition to the power generation contract, Aggreko provided fuel on a pass-through basis for the contract, which was likely to be worth approximately $120m at current prices. The contract was renewed for 6 months in December 2008. In February 2011, the plant was still operational. Jinja power plant was shut down by Aggreko in June 2011 following financial disputes with the government. It was announced that Kiira power plant would not resume operations following the expiry of its contract in June. Power plant was shut down following a financial dispute between Aggreko plc and GoU. Plant was decommissioned as of July 2011 as the government chose not to renew the contract.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data