Aggreko Kampala Temporary Power Station

Sector: Government • Location: Kampala, Uganda

Source: World Bank Group

Project
Active

In April 2005 Aggreko Plc (UK) signed an agreement with the Government of Uganda to install and operate a 50 MW temporary diesel power plant at Lugogo, Kampala for three years. The plant would sell power to the Uganda Electricity Transmission Company Limited, the state-owned company that operates the national grid. The project was designed to provide electricity on a temporary basis to prevent l

Project Information FAQ

Project Information

5 Q
The project “Aggreko Kampala Temporary Power Station” is an infrastructure initiative in the Government sector, located in Kampala, Uganda. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In April 2005 Aggreko Plc (UK) signed an agreement with the Government of Uganda to install and operate a 50 MW temporary diesel power plant at Lugogo, Kampala for three years. The plant would sell power to the Uganda Electricity Transmission Company Limited, the state-owned company that operates the national grid. The project was designed to provide electricity on a temporary basis to prevent load-shedding, until longer term permanent generation could be brought online. Aggreko won the contract over two other final bids (from Cummins Power Generation Ltd and Jacobsen Electro AS) despite not having the lowest bid. The expected cost of the project was US$168 million, of which at least US$120 million would be fuel costs. The plant was designed to be brought online very rapidly, with first electricity available within one week and the full 50 MW within four weeks. Generation began in May 2005. In February 2011, the plant was still operational. Lugogo power plant was temporarily shut down by Aggreko in June 2011 following financial disputes with the government. (update needed) Project was (temporarily?) shut down by Aggreko following financial disputes with the government of Uganda.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data