Aggreko Kampala Temporary Power Station
Sector: Government • Location: Uganda
Source: World Bank Group
In April 2005 Aggreko Plc (UK) signed an agreement with the Government of Uganda to install and operate a 50 MW temporary diesel power plant at Lugogo, Kampala for three years. The plant would sell power to the Uganda Electricity Transmission Company Limited, the state-owned company that operates the national grid. The project was designed to provide electricity on a temporary basis to prevent l
- Status
- Prospective
- Sector
- Government, Power Generation (CCGT)
- Location
- Uganda
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Aggreko Kampala Temporary Power Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In April 2005 Aggreko Plc (UK) signed an agreement with the Government of Uganda to install and operate a 50 MW temporary diesel power plant at Lugogo, Kampala for three years. The plant would sell power to the Uganda Electricity Transmission Company Limited, the state-owned company that operates the national grid. The project was designed to provide electricity on a temporary basis to prevent load-shedding, until longer term permanent generation could be brought online. Aggreko won the contract over two other final bids (from Cummins Power Generation Ltd and Jacobsen Electro AS) despite not having the lowest bid. The expected cost of the project was US$168 million, of which at least US$120 million would be fuel costs. The plant was designed to be brought online very rapidly, with first electricity available within one week and the full 50 MW within four weeks. Generation began in May 2005. In February 2011, the plant was still operational. Lugogo power plant was temporarily shut down by Aggreko in June 2011 following financial disputes with the government. (update needed) Project was (temporarily?) shut down by Aggreko following financial disputes with the government of Uganda. |
Original sector | Energy |
Budget |
Location
Country | Uganda |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Power Generation (CCGT) |
Article published date | 2024-06-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project