Agogo Integrated West Hub project
One of 1,515 projects Taiyo tracks in Angola.
Source: Upstream Online
The Agogo Integrated West Hub project is an offshore oil development in Angola's Block 15/06. It involves exploiting the Agogo and Ndungu fields using a floating production, storage and offloading (FPSO) vessel provided by Yinson. The project aims to boost Angolan oil output by up to 175,000 barrels per day and incorporates the latest carbon capture technology and sustainable power systems.
- Status
- Closed
- Sector
- Oil and Gas, Power Generation (CCGT)
- Location
- Angola
- Updated
- 22 Jul 2026
- Source
- Upstream Online
ConstructChat
Ask ConstructChat about Agogo Integrated West Hub project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Agogo Integrated West Hub project is an offshore oil development in Angola's Block 15/06. It involves exploiting the Agogo and Ndungu fields using a floating production, storage and offloading (FPSO) vessel provided by Yinson. The project aims to boost Angolan oil output by up to 175,000 barrels per day and incorporates the latest carbon capture technology and sustainable power systems. |
Original sector | Energy |
Location
Country | Angola |
Source
Source | Upstream Online |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
