Agra Metro Project
Sector: Road • Location: Agra, Uttar Pradesh, India
Source: Tunnel Business Magazine
The Agra Metro Project involves the construction of a 14.25-km Line-1 route from Sikandra to Taj East Gate, utilizing advanced tunneling technology. The project recently celebrated a significant milestone with the final breakthrough of the 6.61-m diameter Earth Pressure Balance Tunnel Boring Machine (EPBM) S115 on a 2.2-km up-line tunnel section.
- Status
- Under Construction
- Sector
- Road, Rail, Tunnel, Mass Transit, Government
- Location
- Agra, Uttar Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Tunnel Business Magazine
ConstructChat
Ask ConstructChat about Agra Metro Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Agra Metro Project involves the construction of a 14.25-km Line-1 route from Sikandra to Taj East Gate, utilizing advanced tunneling technology. The project recently celebrated a significant milestone with the final breakthrough of the 6.61-m diameter Earth Pressure Balance Tunnel Boring Machine (EPBM) S115 on a 2.2-km up-line tunnel section. |
Original sector | Transportation |
Location
Country | India |
State | Uttar Pradesh |
City | Agra |
Source
Source | Tunnel Business Magazine |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Tunnel, Mass Transit, Government |
Article published date | 2025-01-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
