AGRI-INFRASTRUCTURE AND BIOMASS POWER GENERATION
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project consists of the financing of (i) 2 inland grain silos, (ii) a grain handling and storage terminal located within the Port of Chernomorsk, (iii) 5 biomass-fired CHPs and (iv) one sunflower oil crushing plant, in different locations in Ukraine
- Status
- Prospective
- Sector
- Biomass, Consumer Products, Oil and Gas, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Seaport, Government
- Location
- Ukraine
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about AGRI-INFRASTRUCTURE AND BIOMASS POWER GENERATION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | financed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the financing of (i) 2 inland grain silos, (ii) a grain handling and storage terminal located within the Port of Chernomorsk, (iii) 5 biomass-fired CHPs and (iv) one sunflower oil crushing plant, in different locations in Ukraine |
Original sector | Industry, Transport, Agriculture, fisheries, forestry, Energy |
Budget |
Location
Country | Ukraine |
Source
Source reliability | High |
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Biomass, Consumer Products, Oil and Gas, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Seaport, Government |
Article published date | 2023-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
