Agrivoltaic Project in Parbhani
Under construction · Maharashtra · Last reported Apr 2025
Source: The Better India
The agrivoltaic setup in Parbhani, Maharashtra, allows crops like ginger, turmeric, green gram, and okra to grow beneath elevated solar panels, maximizing land use while generating solar energy. This project is part of a larger 50 MW solar installation by SunSeed APV, Kanoda Energy, and GIZ German Development Cooperation, showcasing the potential of agrivoltaics in India.
- Status
- Under Construction
- Sector
- Solar, Power Generation (CCGT), Raw Materials
- Location
- Parbhani, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- The Better India
ConstructChat
Ask ConstructChat about Agrivoltaic Project in Parbhani
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The agrivoltaic setup in Parbhani, Maharashtra, allows crops like ginger, turmeric, green gram, and okra to grow beneath elevated solar panels, maximizing land use while generating solar energy. This project is part of a larger 50 MW solar installation by SunSeed APV, Kanoda Energy, and GIZ German Development Cooperation, showcasing the potential of agrivoltaics in India. |
Original sector | Agriculture |
Location
Country | India |
State | Maharashtra |
City | Parbhani |
Source
Source | The Better India |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Raw Materials |
Article published date | 2025-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
