Agua Fria Solar Power Plant
Sector: Water Supply and Storage • Location: Honduras
Source: World Bank Group
A partnership of the Norwegian companies Scatec Solar ASA (40%) and Norfund KLP (30%) and the local company PEMSA (30%) was granted the authorization to build and operate a 60-MW solar power plant located at Nacaome, Valle Department . The electricity generated by the power plant was set to be directed to the country's national grid (a 20-year power purchase agreement (PPA) was signed with Hondura
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Power Generation (CCGT), Solar, Government
- Location
- Honduras
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Agua Fria Solar Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A partnership of the Norwegian companies Scatec Solar ASA (40%) and Norfund KLP (30%) and the local company PEMSA (30%) was granted the authorization to build and operate a 60-MW solar power plant located at Nacaome, Valle Department . The electricity generated by the power plant was set to be directed to the country's national grid (a 20-year power purchase agreement (PPA) was signed with Honduras’s state-owned company Empresa Nacional de Energía Eléctrica). The project cost was estimated at US$ 125 million. Operations were expected to commence in the second semester of 2015. In December 2014, Export Credit Norway, Norwegian Export Credit Guarantee Agency and Corporación Interamericana approved a US$ 90 million loan. Operations commenced in May 2015. |
Original sector | Energy |
Budget |
Location
Country | Honduras |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Generation (CCGT), Solar, Government |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
