logo

Agua Negra Tunnel

Sector: Automotive • Location: Argentina

Source: Road Traffic Technology

Project
Closed

The Agua Negra Tunnel will link Argentina and Chile through the Andes mountains. Credit: Vrac. Chilean side of the Agua Negra mountain passageway. Credit: Joe Merlo. The Agua Negra Tunnel will connect Argentinean portal at 4,085m above sea level. Credit: Daniel Peppes Gauer. Agua Negra Tunnel is a 13.9km-long cross-border tunnel being constructed across the Andes mountain range between Argentina a

Project Information FAQ

Project Information

5 Q
The project “Agua Negra Tunnel” is an infrastructure initiative in the Automotive sector, located in Argentina. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Agua Negra Tunnel will link Argentina and Chile through the Andes mountains. Credit: Vrac. Chilean side of the Agua Negra mountain passageway. Credit: Joe Merlo. The Agua Negra Tunnel will connect Argentinean portal at 4,085m above sea level. Credit: Daniel Peppes Gauer. Agua Negra Tunnel is a 13.9km-long cross-border tunnel being constructed across the Andes mountain range between Argentina and Chile. It forms a vital component of the Bi-oceanic Corridor connecting Porto Coquimbo in Chile with Porto Alegre in Brazil. The tunnel will reduce the length of the existing Agua Negra mountain roadway by 40km while reducing travel times by approximately three hours. It is also expected to improve trade between the two nations. The Agua Negra tunnel project is estimated to cost approximately $1.5bn. Construction is expected to begin by the end of 2017 and the tunnel is scheduled to become operational by 2027. The new Agua Negra tunnel is being developed to mitigate the inefficiencies and bottlenecks of the existing Agua Negra mountain passage. The roadway currently handles up to 10,500 vehicles a year, with no scope for freight operations. In addition, the existing passage is closed for much of the winter season. Once operational, the new tunnel will offer year-round access, allowing it to be used by more than 260,000 vehicles annually. Officially approved by the Government of Argentina in March 2015, the project was announced in October 2016. An underground laboratory known as the Agua Negra Deep Experiment Site (ANDES) has also been planned as part of the construction. In April 2016, Argentina and Chile signed agreements with the Inter-American Development Bank (IDB) to finance the Agua Negra Tunnel project. The twin tunnel will connect an Argentinean portal at 4,085m above sea level with a Chilean portal at 3,620m above sea level. Its design avoids the use of an intermediate slab to enhance its longitudinal ventilation and geo-mechanical characteristics. The tunnel will feature interconnection passages every 250m for pedestrians, while cross passages for vehicles will be provided with every 1,550m. It will also house ramps and two ventilation caverns. The cavern in Argentina’s territory will have a vertical ventilation shaft of 500m, while the cavern on the Chilean side will include a 4.5km-long ventilation shaft. The horseshoe-shaped cross-section of each tunnel will measure 70m². Each tunnel will accommodate a dual-lane carriageway comprising a free section with a width of 7.5m and a clearance of 4.8m. Either side of the roadway will be provided with pedestrian walkways. The construction concept will call for the boring of the tunnel from either side of the portals. Drill and blast excavation will be carried out according to the geological conditions in the site. The tunnel will be constructed to resist extreme meteorological conditions and high seismic activity. The project will also involve the construction of a new integrated traffic control centre (ITCC) to monitor sanitary ventilation, lightning and internal visibility. Buildings equipped with fire-fighting will also be built next to the portals. The $1.5bn Agua Negra tunnel project will be fully funded by the IDB, which granted an initial $40m loan for the project in December 2016. The loan will allow the nations to initiate the bidding process to begin the construction of the tunnel. The IDB loan forms part of Programa de Estructuración del Túnel Internacional Paso de Agua Negra (PETAN), which includes two concurrent technical co-operation loans of $20m, one each for Argentina and Chile. Each loan has an implementation period of two years. Lombardi was contracted to provide the conceptual study, preliminary project and technical tender documentation for the electromechanical systems, as well as below-ground and external civil works. The consortium of Austria-based Geoconsult ZT, Argentina-based Geoconsult, and De La Torre Antonio & Asociados were chosen to conduct the geological, hydrogeological and geotechnical mapping for the twin tunnel sections. Dirección Provincial de Vialidad (DPV) placed a contract with Ecominera and Rizzo Associates Argentina for extensive geological, geotechnical and hydro-geological drilling studies for the feasibility stage of the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data