logo

Aguas de Panama S.A.

Sector: Bridge • Location: Panama

Source: International Finance Corporation (IFC)

Project
Completed

In April 1998 the Instituto de Acueductos y Alcantarillados Nacionales (IDAAN), the National Water Company of Panama awarded the Lake Gatun Potable Water Supply Concession to Aguas de Panama S.A. (APSA), a special purpose company created by British water company Biwater Supply Limited, though an international bid. Under the Concession Contract APSA will, throughout the thirty year concession peri

Project Information FAQ

Project Information

5 Q
The project “Aguas de Panama S.A.” is an infrastructure initiative in the Bridge sector, located in Panama. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In April 1998 the Instituto de Acueductos y Alcantarillados Nacionales (IDAAN), the National Water Company of Panama awarded the Lake Gatun Potable Water Supply Concession to Aguas de Panama S.A. (APSA), a special purpose company created by British water company Biwater Supply Limited, though an international bid. Under the Concession Contract APSA will, throughout the thirty year concession period, abstract water from Lake Gatun, treat it and deliver an agreed daily volume of potable water [varying between 15 and 20 million gallons per day (mgd)] into the existing distribution system at Nuevo Chorrillo. The towns of Arraijan, Chorrera and Capira served by the Nuevo Chorrillo water supply system have a present total population of 270,000, and are facing an acute water shortage due to the inability of IDAAN to produce sufficient water to supply the population in these areas. IFC is now being asked to consider financing of up to $16 million to replace bridge shareholder financing from Biwater Supply Limited used to construct the facilities, which began operation in September 2002. The principal components of the project include: raw water intake works at Lake Gatun, with associated pretreatment filters and pumping station; an 11 km, buried, pressurized pipeline that carries raw water to the water treatment works (WTW) at Nuevo Emperador; a 20 mgd capacity WTW and associated works (Laguna Alta), and an 9.3 km buried, gravity pipeline that takes treated water to the distribution system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data