Ahlone Power Plant
Sector: Commercial • Location: Myanmar
Source: World Bank Group
TOYO THAI POWER MYANMAR CO. LTD. (TTPMC) developed a 121MW Combined Cycle Gas Turbine (CCGT) Power Plant in Ahlone Township, Yangoon, Myanmar on build-own-operate (BOO) basis. The plant’s first gas turbine installation was completed in April 2013 followed by the second gas turbine in July 2013. The construction is expected to be completed in the second half of 2014 with a total investment cost of
- Status
- Prospective
- Sector
- Commercial, Wind, Power Generation (CCGT), Government, Natural Gas
- Location
- Myanmar (Burma)
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Ahlone Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | TOYO THAI POWER MYANMAR CO. LTD. (TTPMC) developed a 121MW Combined Cycle Gas Turbine (CCGT) Power Plant in Ahlone Township, Yangoon, Myanmar on build-own-operate (BOO) basis. The plant’s first gas turbine installation was completed in April 2013 followed by the second gas turbine in July 2013. The construction is expected to be completed in the second half of 2014 with a total investment cost of USD 170 million. In November 2012, the Ministry of Electric Power signed an agreement with TTPMC to build the Ahlone CCGT power plant. There does not appear to be any competitive bidding process to award the project. TTPMC is a 100% subsidiary of TOYO-THAI CORPORATION PUBLIC COMPANY LIMITED (TTCPCL), a publicly listed company in the Thai Stock exchange. Other major shareholders in TTCPCL include Japanese Toyo Engineering Corporation (22.3 %) and Chiyoda Corporation (6%). TTPMC took short terms loans for a period of six months from a commercial bank in the amount of USD 30 million to finance the import of major machines and equipment that was expected to be repaid in the first half of 2014. |
Original sector | Energy |
Budget |
Location
Country | Myanmar (Burma) |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Power Generation (CCGT), Government, Natural Gas |
Article published date | 2024-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project