AI Data Center Power Equipment Supply Project
Sector: Data Center • Location: Tennessee, United States
Source: 조선일보
LS Electric has signed a contract to supply high-voltage and low-voltage switchgear and transformers for an AI data center being built in Tennessee, U.S. The equipment will be used in the electrical room of the server room for AI machine learning and the data center's mechanical facilities, with delivery by April next year.
- Status
- Closed
- Sector
- Data Center, Power Transmission, Power Generation (CCGT)
- Location
- Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- 조선일보
ConstructChat
Ask ConstructChat about AI Data Center Power Equipment Supply Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | LS Electric has signed a contract to supply high-voltage and low-voltage switchgear and transformers for an AI data center being built in Tennessee, U.S. The equipment will be used in the electrical room of the server room for AI machine learning and the data center's mechanical facilities, with delivery by April next year. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
Source
Source | 조선일보 |
URL |
More Details
Record type | Project |
Sector | Data Center, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-11-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
