logo

Aimores Power Plant

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

The project comprises the construction and operation of a 330MW power plant (Aimores), in the Doce river in the state of Minas Gerais. The consortium responsible for the project originally comprised Centrais Eletricas de Minas Gerais (CEMIG) (49%), the CEMIG's shareholder AES (25.5%), and Companhia Vale do Rio Doce (CVRD) (25.5%). AES withdraw from the project in 1999 and CVRD took over its stake,

Project Information FAQ

Project Information

4 Q
The project “Aimores Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the construction and operation of a 330MW power plant (Aimores), in the Doce river in the state of Minas Gerais. The consortium responsible for the project originally comprised Centrais Eletricas de Minas Gerais (CEMIG) (49%), the CEMIG's shareholder AES (25.5%), and Companhia Vale do Rio Doce (CVRD) (25.5%). AES withdraw from the project in 1999 and CVRD took over its stake, becoming responsible for 51% of the project. In December 2000, ANEEL, the Brazilian regulatory agency for the eletricity sector, signed the concession contract with CEMIG and CVRD. The total estimated investments in the project are US$165.7 million (R$325 million). The plant was expected to start operations in 2004. In June 2003, the Brazilian Development Bank approved a US$48 million loan in connection with the Funil and Aimores power plants. In addition, in January 2003, CVRD acquired US$300 million from the Japanese Bank for International Cooperation and, in April, US$64 million from the American Import Export Bank in connection with its generation projects. In addition to Funil and Aimores, the consortium CEMIG-CVRD owns stakes in Capim Branco and Porto Estrela power plants. Aimores power plant will be located in the border to the states of Minas Gerais and Espirito Santo, which is mainly a consumption area: there are no power plants in this region. According to CEMIG, the plant is expected to reduce losses causes by the transmission of electricity from the generation centers to this consumption region. In February 2006, the first of three turbines became fully operational generating 110 MW of electricity. The plant was officially inaugurated and given the honorary name Eliezer Batista after the former CVRD president and government minister in a ceremony on May 5, 2006.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data