logo

Air Liquide Ukraine

Sector: Manufacturing (Industrial) • Location: Ukraine

Source: European Bank for Reconstruction and Development (EBRD)

Project
Signed

The EBRD is considering providing a loan of up to € 85 million to JSC Air Liquide Yenakievo to construct and operate an on-site air separation plant at Yenakievo Iron and Steel Works in south-eastern Ukraine. The project, when approved by the EBRD’s Board of Directors, is intended to upgrade the quality and reliability of industrial gases supplied to the steelworks and to improve energy efficiency

Project Information FAQ

Project Information

3 Q
The project “Air Liquide Ukraine” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Ukraine. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

signed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EBRD is considering providing a loan of up to € 85 million to JSC Air Liquide Yenakievo to construct and operate an on-site air separation plant at Yenakievo Iron and Steel Works in south-eastern Ukraine. The project, when approved by the EBRD’s Board of Directors, is intended to upgrade the quality and reliability of industrial gases supplied to the steelworks and to improve energy efficiency. Setting New Standards for Business Conduct As the first “over-the-fence” project for the supply of industrial gases to the steel industry in Ukraine, the Project will have an important demonstration effect in this major sector of the domestic economy. Setting New Energy Efficiency and Environmental Standards Through the replacement of outdated facilities by state-of-the-art air supply units, the Project will foster greater energy efficiency of its client’s operations and promote new environmental standards for the Ukrainian steel industry. JSC Air Liquide Yenakievo will be part of the Air Liquide group. Air Liquide SA is the world leader in gases for industry, health and the environment. The EBRD is considering providing up to €85 million senior long term loan. Around €100 million. Category B, requiring an Environmental and Social Due Diligence (ESDD), consisting of an environmental analysis of the proposed investment programme and an environmental and social audit of the existing facilities. The replacement of old air separation units ("ASUs") with state-of-the-art technology has significant environmental benefits. These will range from energy efficiency and therefore carbon emissions reductions to improved safety of the installations and reduced risk of industrial accidents. The new unit is fully compliant with EU IPPC and Seveso Directive requirements and meet EU Best Available Techniques requirements. The ASU will be located on the steelworks site, well away from residential areas, and the operations will have limited impact on any third party. The due diligence undertaken included a top level review of the operations of the existing steel plants. The operation at the existing host plants is outside the Bank’s area of influence as defined by the Bank’s Environmental and Social Policy. Overall, the ESDD has confirmed that the project is fully structured to meet Bank requirements and that the Company has a good environmental and social management system and the capacity to fully implement the Bank’s Performance Requirements ("PRs") of Environmental & Social Policy. As part of the Environmental and Social Action Plan, the Company will implement Air Liquide corporate Environmental, Health and Safety standards, which are well developed and fully meet the Banks PRs. The Company will also develop and implement Environmental Management Systems, compliant with such standards as ISO 14001 and OHSASH 18001, at each new facility operated in Ukraine. In terms of social aspects, the Company has good Human Resource management system and is addressing social and labour issues in line with national requirements as well as corporate standards that meet the Bank’s PRs. The replacement of the existing units with new state of the art unit will reduce labour needed, but the retrenchment will be limited. As required, the Company undertakes local Environmental Impact Assessment for all new capital construction projects. In addition to the local disclosure, the Bank has worked with the Company to develop a corporate Stakeholder Engagement Plan ("SEP") in line with PR10. As part of the SEP implementation the Company is to publish on its website a Non-Technical Summary ("NTS") summarizing the project and its cumulative impacts and overall environmental and social issues, and measures to mitigate them. The NTS will be provided for each new project undertaken by the Company in Ukraine. The Bank will monitor the project implementation through annual reporting and monitoring visits. None. Corinne Estrade-Bordry, Directeur Relations extérieures Tel : + 33 (0)1 40 62 51 31

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data