logo
ProjectForthcoming

Air Traffic Control - Trajectory Based Operations 2

Sector: Education • Location: Belgium, Ireland, Germany, United Kingdom, Czechia, France, Italy, Austria, Sweden, Spain, Croatia, Denmark, Portugal, Switzerland, Netherlands, Türkiye, Iceland, Ukraine

Source: EU Funding & Tenders Portal

"The Air Traffic Control - Trajectory Based Operations 2 (ATC-TBO 2) project proposes to validate four TBO SESAR Solutions for flights in the tactical execution phase for enroute and TMA operations, thus making a significant contribution to the realisation of the Digital European Sky vision in SESAR Phase D. The results are expected to contribute to capacity, operational efficiency, safety, enviro

Status
Prospective
Sector
Education, Electric Vehicles (EVs), Automotive, Aerospace & Defense, Road
Location
Belgium
Updated
19 Nov 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Air Traffic Control - Trajectory Based Operations 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Air Traffic Control - Trajectory Based Operations 2” is an infrastructure initiative in the Education sector, located in Belgium, Ireland, Germany, United Kingdom, Czechia, France, Italy, Austria, Sweden, Spain, Croatia, Denmark, Portugal, Switzerland, Netherlands, Türkiye, Iceland, Ukraine. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

forthcoming

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

"The Air Traffic Control - Trajectory Based Operations 2 (ATC-TBO 2) project proposes to validate four TBO SESAR Solutions for flights in the tactical execution phase for enroute and TMA operations, thus making a significant contribution to the realisation of the Digital European Sky vision in SESAR Phase D. The results are expected to contribute to capacity, operational efficiency, safety, environment and cost efficiency benefits. The SESAR Solutions, with the TRL levels at the start and end of the project, are: • Solution #EFA =: EFB-FMS ATC interactions (Initial = TRL 1/2; Target = TRL4). • Solution #DLE = AU/ATC trajectory synchronisation (CPDLC) En-Route (Initial = TRL4; Target = TRL6). • Solution #DLT = AU/ATC trajectory synchronization (CPDLC) TMA and Extended TMA (Initial = TRL1/2; Target = TRL4). • Solution #HAA = High Automated ATC (Initial = TRL2; Target = TRL4). The ATC-TBO 2 contribution to the SESAR Global TBO document (led by NETWORK-TBO 2) will be performed within the SPR-INTEROP/OSED tasks for each of the four ATC-TBO Solutions. The ATC-TBO 2 project consortium – with EUROCONTROL as the project coordinator, and with steering from the project management board, the joint NETWORK-TBO and ATC-TBO advisory board, and the SJU - brings together complementary air and ground resources from 14 air navigation service providers, 4 airspace users, 15 airborne and ground industry partners, 8 research and consulting establishments, and 1 university from 14 member states, Island, Switzerland, Turkey and the UK are represented. "

Location

Country

Belgium

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Education, Electric Vehicles (EVs), Automotive, Aerospace & Defense, Road

Article published date

2026-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project