Air Traffic Control Tower Building Modernization
One of 9,699 projects Taiyo tracks in Montana.
Source: Dodge
The major elements of work are divided into two bidding - replaces items such as the existing elevator, new LED lighting throughout the facility, new fiber terminations, automated controls for the boilers, enhance HVAC cooling, replace the roof hatch, replace the blinds in the control cab, replace the sign on the exterior of the building
- Status
- Closed
- Sector
- Airport, Government, Commercial, Manufacturing (Industrial)
- Location
- Missoula, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Air Traffic Control Tower Building Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The major elements of work are divided into two bidding - replaces items such as the existing elevator, new LED lighting throughout the facility, new fiber terminations, automated controls for the boilers, enhance HVAC cooling, replace the roof hatch, replace the blinds in the control cab, replace the sign on the exterior of the building |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Missoula |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Airport, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
