Air Traffic Control Tower
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
The scope of the project consists of the removal and replacement of the Air Traffic Control Tower (ATCT) at the Space Coast Regional Airport in Titusville, Florida. This project requires new ATCT building, site work, paving, grading, drainage, trenching, conduit, conductor, and vault work. This project includes a minor amount of directional boring, earthwork and sodding
- Status
- Closed
- Sector
- Airport, Waste Processing and Treatment, Commercial, Water Supply and Storage, Government
- Location
- Titusville, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Air Traffic Control Tower
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of the project consists of the removal and replacement of the Air Traffic Control Tower (ATCT) at the Space Coast Regional Airport in Titusville, Florida. This project requires new ATCT building, site work, paving, grading, drainage, trenching, conduit, conductor, and vault work. This project includes a minor amount of directional boring, earthwork and sodding |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Titusville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Airport, Waste Processing and Treatment, Commercial, Water Supply and Storage, Government |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
