Airfield Modifications Phase 1
Sector: Airport • Location: Trenton, Ontario, Canada
Source: Dodge
DEFENCE CONSTRUCTION CANADA (DCC) HQ0107DC_81949 STTC - Airfield Modifications - Phase 1: Runway 06-24 and Taxiway Papa, Trenton ON Work under this Contract covers all labour, materials, and equipment to rehabilitate Runway 06-24, Taxiway Papa and associated connector taxiways at 8 Wing Trenton, Ontario. The scope of work includes, but is not limited to: demolition, removal and crushing of existin
- Status
- Closed
- Sector
- Airport, Cement, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial)
- Location
- Trenton, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Airfield Modifications Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DEFENCE CONSTRUCTION CANADA (DCC) HQ0107DC_81949 STTC - Airfield Modifications - Phase 1: Runway 06-24 and Taxiway Papa, Trenton ON Work under this Contract covers all labour, materials, and equipment to rehabilitate Runway 06-24, Taxiway Papa and associated connector taxiways at 8 Wing Trenton, Ontario. The scope of work includes, but is not limited to: demolition, removal and crushing of existing asphalt and concrete pavements; cold milling of existing asphalt pavements; removal of existing... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Trenton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Airport, Cement, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in Canada
- Highway Rehab -- Bridge rehabilitation, Culvert rehabilitation, Culvert replacement Aviation Bridge and Walkley Rd, Ottawa
- Russell-Binscarth Airport Resurfacing
- Stoney Trail Northeast
- Iqaluit International Airport Improvement Project
- Réseau électrique métropolitain de Montréal (Montreal LRT)
- Canada Line
- Electric Vehicle Charging Station at Pearson Airport - Terminal 3
- Electric Vehicle Charging Station at Airport Mariott (ImPark)
