logo
ProjectBidding

Airfield Projects Contract 3

One of 10,000+ projects Taiyo tracks in Washington.

Source: Dodge USA

The 2024 Airfield Contract. 3 consists of two work proj-ects. Perimeter Access Gate Enhancements PAGE project that will install power and com-munication infrastructure for existing and new AOA fence and gate. The Perimeter Intrusion Detection SystemPIDS Infrastructure Phase 2 project will install power and communi-cation. infrastructure for the PIDS technology project. The work loca-tion is Air Op

Status
Prospective
Sector
Government, Airport, Manufacturing (Industrial), Commercial, Power Generation (CCGT)
Location
Seattle, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Airfield Projects Contract 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Airfield Projects Contract 3” is an infrastructure initiative in the Government sector, located in Seattle, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 2024 Airfield Contract. 3 consists of two work proj-ects. Perimeter Access Gate Enhancements PAGE project that will install power and com-munication infrastructure for existing and new AOA fence and gate. The Perimeter Intrusion Detection SystemPIDS Infrastructure Phase 2 project will install power and communi-cation. infrastructure for the PIDS technology project. The work loca-tion is Air Operations AreaA0A, of Seattle-Tacoma International Airport, 17801 International Boulevard, City of...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Seattle

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Airport, Manufacturing (Industrial), Commercial, Power Generation (CCGT)

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project