logo

Airport AEC 1 Backfilling Phase 1 IQC

Sector: Airport • Location: Watson Lake, Yukon, Canada

Source: Dodge USA

Project
Closed

Site Preparation, Site Facilities Provision, Site Facilities Operation, Fill and grade for drainage, Waste Oversize Debris Removal, Re-vegetate of the construction area and Ditches, and Site Restoration for a back filling project located at Watson Lake Airport. Watson Lake is located at approximately Km 986 on the Alaska Highway. Work to be performed under the Contract includes, but is not limited

Status
Closed
Sector
Airport, Road, Consumer Products, Commercial, Aerospace & Defense, Waste Processing and Treatment
Location
Watson Lake, Yukon, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Airport AEC 1 Backfilling Phase 1 IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Airport AEC 1 Backfilling Phase 1 IQC” is an infrastructure initiative in the Airport sector, located in Watson Lake, Yukon, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Site Preparation, Site Facilities Provision, Site Facilities Operation, Fill and grade for drainage, Waste Oversize Debris Removal, Re-vegetate of the construction area and Ditches, and Site Restoration for a back filling project located at Watson Lake Airport. Watson Lake is located at approximately Km 986 on the Alaska Highway. Work to be performed under the Contract includes, but is not limited to: Pre-mobilization Submittals, Mobilization, Site Preparation, Site Facilities Provision, Site...

Procurement method

Budget

Location

Country

Canada

State

Yukon

City

Watson Lake

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Airport, Road, Consumer Products, Commercial, Aerospace & Defense, Waste Processing and Treatment

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project