logo

Airport Boulevard Resurfacing

Sector: Airport • Location: California, United States of America

Source: Riverside County

Project
Closed

Limits: Van Buren Street to Harrison Street Length: Approximately 1 mile District: 4 Community: Vista Santa Rosa

The County of Riverside Transportation Department proposes to resurface approximately 1 mile of Airport Boulevard from Van Buren Street to Harrison Street. Airport Boulevard is classified as an Urban Arterial in the County of Riverside General Plan. Airport Boulevard is a two lane roa

Project Information FAQ

Project Information

4 Q
The project “Airport Boulevard Resurfacing” is an infrastructure initiative in the Airport sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Van Buren Street to Harrison Street Length: Approximately 1 mile District: 4 Community: Vista Santa Rosa The County of Riverside Transportation Department proposes to resurface approximately 1 mile of Airport Boulevard from Van Buren Street to Harrison Street. Airport Boulevard is classified as an Urban Arterial in the County of Riverside General Plan. Airport Boulevard is a two lane road that is 40 feet wide. The proposed improvements consist of Cold-in-Place Recycling (CIR) the roadway and overlaying with Hot Mix Asphalt (HMA). Additional improvements include: Reconstruction of concrete curb ramp, driveway, and asphalt concrete driveway Placement of safety edge and shoulder backing Utility adjustments Detector loops Striping of roadway, including pavement markers and reflectors Salvage/removal and installation of new signs No additional right-of-way or temporary construction easements will be required to construct the proposed improvements. The project improvements will raise the existing roadway profile by 0.30 feet.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data