Airport Fuel Farm Construction
Sector: Water Supply and Storage • Location: Los Alamos, New Mexico, United States of America
Source: Dodge USA
- Construct a fuel farm at the Los Alamos airport consisting of site work to prepare for installation of two 12,000-gallon UL-2085 Fireguard Tanks including all mechanical and electrical equipment detailed in the design documents. One tank will be used for AvGas (100LL) and one for Jet-A. The base bid will include all site work and electrical work for tank and credit card reader connections. The
- Status
- Closed
- Sector
- Water Supply and Storage, Airport, Power Generation (CCGT), Raw Materials, Waste Processing and Treatment, Road, Consumer Products, Government, Commercial
- Location
- Los Alamos, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Airport Fuel Farm Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Construct a fuel farm at the Los Alamos airport consisting of site work to prepare for installation of two 12,000-gallon UL-2085 Fireguard Tanks including all mechanical and electrical equipment detailed in the design documents. One tank will be used for AvGas (100LL) and one for Jet-A. The base bid will include all site work and electrical work for tank and credit card reader connections. The electrical panel rack is also included. 2. Site work includes removal of existing asphalt, concre... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Los Alamos |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Airport, Power Generation (CCGT), Raw Materials, Waste Processing and Treatment, Road, Consumer Products, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
