Airport Perimeter Canal Maintenance Clearing - Segment 3
Sector: Aerospace & Defense • Location: Sebring, Florida, United States of America
Source: Dodge USA
The project begins in the channel section north of Gate 8A canal crossing and continues downstream to the south edge of the West Pond. The maintenance clearing work effort involves removal of vegetation, trees, soil, muck, and debris from the bottom of the channel section for a total length of 1,445-feet.
- Status
- Prospective
- Sector
- Aerospace & Defense, Water Supply and Storage, Consumer Products, Waste Processing and Treatment, Airport, Government, Commercial
- Location
- Sebring, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Airport Perimeter Canal Maintenance Clearing - Segment 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project begins in the channel section north of Gate 8A canal crossing and continues downstream to the south edge of the West Pond. The maintenance clearing work effort involves removal of vegetation, trees, soil, muck, and debris from the bottom of the channel section for a total length of 1,445-feet. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Sebring |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Water Supply and Storage, Consumer Products, Waste Processing and Treatment, Airport, Government, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in United States of America
- DCA Terminal A Improvements
- ATL Plane Train Tunnel West Extension
- Kansas City International Airport (MCI) New Single Terminal
- MTPD District II Substation & Training Facility
- IAD East/West Baggage Handling & Concourse C/D Rehabilitation
- LAX Central Utility Plant Replacement
- Ellington Airport (EFD) Traffic Control Tower and Utility Building
- LAX Tom Bradley International Terminal Improvements
