logo

Airport Road Flood Upgrades

Sector: Airport • Location: Northwest Territories, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The Town of Hay River, NT is highly susceptible to springtime flooding due to annual ice jamming and the effects of freshet in the Hay River as it flows north into Great Slave Lake. The river bifurcates, and in its western channel, there has been a consistent history of flooding. The recent 2022 caused extensive damage to numerous homes and businesses as well as a ballpark. The project will raise

Project Information FAQ

Project Information

5 Q
The project “Airport Road Flood Upgrades” is an infrastructure initiative in the Airport sector, located in Northwest Territories, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Town of Hay River, NT is highly susceptible to springtime flooding due to annual ice jamming and the effects of freshet in the Hay River as it flows north into Great Slave Lake. The river bifurcates, and in its western channel, there has been a consistent history of flooding. The recent 2022 caused extensive damage to numerous homes and businesses as well as a ballpark. The project will raise the level of Airport Road which runs adjacent to the west channel as well as install appropriate water drainage infrastructure. The road that most impacted will be asphalted to make it resistant to flood erosion as well as banked with impermeable materials. The access road to the town’s water plant will also be elevated to ensure access during a flood period.These efforts will provide a return on investment of $11.78 of flood damage loss avoided for every $1 invested over the life of the asset.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data