logo

Airports Madagascar

Sector: Water Supply and Storage • Location: Madagascar

Source: International Finance Corporation (IFC)

Project
Active

Ravinala Airports (“Ravinala Airports”, the “consortium” or the “concessionaire”), a company to be owned by a consortium comprised of ADPM (Aéroports de Paris Management), BBI (Bouygues Bâtiment International), Colas Madagascar and Meridiam has been appointed by the Government of Madagascar as concessionaire of to take over a 28 years concession for the extension, refurbishment, operations and mai

Project Information FAQ

Project Information

4 Q
The project “Airports Madagascar” is an infrastructure initiative in the Water Supply and Storage sector, located in Madagascar. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ravinala Airports (“Ravinala Airports”, the “consortium” or the “concessionaire”), a company to be owned by a consortium comprised of ADPM (Aéroports de Paris Management), BBI (Bouygues Bâtiment International), Colas Madagascar and Meridiam has been appointed by the Government of Madagascar as concessionaire of to take over a 28 years concession for the extension, refurbishment, operations and maintenance of Ivato and Fascene airports located in Antananarivo and Nosy Be island respectively. CMBI, a joint venture company incorporated by BBI and Colas Madagascar (the “EPC contractor”) will be in charge of the construction phase for both airports, while ADPM will enter into a Technical Services Agreement to assist Ravinala Airports for the operation and maintenance of both airports. The proposed IFC investment is a financing package of: (a) IFC A loan of up to EUR 45 million; and (b) an interest rate swap to cover up to the full amount of the debt (“the project”). As part of the concession agreement, both airports’ passenger terminals and runway capacities will need to be expanded to meet market demand. The construction and improvement works at the airports are planned in two phases as set out in the concession agreement. IFC financing will be used to fund the first phase of works (Phase 1) included in the concession agreement, which consist of: (1) ongoing works at Ivato in preparation of the Francophonie summit (expansion of apron and presidential pavilion as well as establishment of a dedicated process path in the existing terminal for arriving/departing delegations), to be held in Antananarivo at the end of November; (2) construction of a new passenger terminal at Ivato airport and limited refurbishment works in the existing terminal; (3) renovation of the runway and Tarmac II to host aircrafts Code E and one Code F at Ivato; (4) renovation of the runway and limited expansion of the current passenger terminal at Fascene airport; and (5) rehabilitation of landside facilities at both airports, including the construction of new wastewater treatment plants, improvement of the existing incinerator at Fascene airport to meet emission standards, improvement of surface water drainage, construction of a new waste water treatment plant and installation of an oil water separator at Ivato airport. Phase 1 works are scheduled to start end of November 2016 and to have a duration of 32 months at Ivato airport and 19 months at Fascene airport. Phase 2 works will include runway extension at both airports, terminal extension and renovation of the apron at Ivato and a new terminal building at Fascene airport as well as a new apron for Code E; however they will only be initiated when certain passenger and air traffic volumes have been met. According to the traffic models currently available, except for the apron renovation and extension which will be subject to new due diligence and financing structure, these thresholds will not be met during the tenor of IFC’s loan and, therefore, it is expected that the proceeds from the proposed IFC investment will not be used to finance Phase 2.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data