logo

AirTrain Newark Replacement PPP project

Sector: Automotive • Location: United States of America

Source: InfraPPPWorld

Project
Project In Tender

The project includes the replacement of the existing AirTrain system with the new AirTrain in Newark Airport. The existing system is reaching its life expectancy and cannot accommodate the current passenger demand and future needs of the airport. The new AirTrain Newark will provide for a completely new Right-of-Way (ROW) in a revised alignment to meet the changing Airport layout. The project will

Project Information FAQ

Project Information

5 Q
The project “AirTrain Newark Replacement PPP project” is an infrastructure initiative in the Automotive sector, located in United States of America. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in tender

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes the replacement of the existing AirTrain system with the new AirTrain in Newark Airport. The existing system is reaching its life expectancy and cannot accommodate the current passenger demand and future needs of the airport. The new AirTrain Newark will provide for a completely new Right-of-Way (ROW) in a revised alignment to meet the changing Airport layout. The project will be a 2.5-mile elevated guideway train system and will be designed to maximize customer convenience with seamless connections to other forms of transportation and provide modern tools and amenities in AirTrain stations and in vehicles. The expected operation rate is 2,000-3,500 passengers per hour per direction. In addition to the guideway, the following infrastructure will be constructed or provided: 3 stations Maintenance Control Facility Grade-separated pedestrian connections from stations to terminals 15-20 vehicles Power distribution system including substations Automated train control system  Supervisory control and data acquisition systems    

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data