AirTrain Newark Replacement
Bid results · New Jersey · Last reported Aug 2025
Source: Dodge
Design, construct, and operate and maintain a 2.5-mile elevated guideway train system and replacement to the elevated AirTrain people mover system at Newark Liberty International Airport (EWR). Including: 2.5-mile elevated Guideway Structure for the System Technology equipment and Vehicles, 3 Stations including back of house (BOH) areas for the System Technology equipment, Design of a future stati
- Status
- Closed
- Sector
- Steel, Airport, Rail, Automotive, Commercial, Power Generation (CCGT)
- Location
- Newark, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AirTrain Newark Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design, construct, and operate and maintain a 2.5-mile elevated guideway train system and replacement to the elevated AirTrain people mover system at Newark Liberty International Airport (EWR). Including: 2.5-mile elevated Guideway Structure for the System Technology equipment and Vehicles, 3 Stations including back of house (BOH) areas for the System Technology equipment, Design of a future station and construction to support the future station, Integration with the guideway and Stations, Pa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Newark |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Airport, Rail, Automotive, Commercial, Power Generation (CCGT) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
