logo

Ajmer Nagaur State Highway

Sector: Automotive • Location: Rajasthan, India

Source: World Bank Group

Project
Active

On 23rd March 2012, the Government of Rajasthan (Public Works Department on behalf of Ministry of Road Transport and Highways (MoRTH), Government of India) awarded a 21 year concession (including construction period of 2 years) to GVR Infraprojects Limited (GVR) for the strengthening, improvement, two-laning, operation and maintenance, and tolling of 148.21kms Ajmer–Nagaur Section of NH-89, in the

Status
Prospective
Sector
Automotive, Bridge, Government, Road, Commercial, Waste Processing and Treatment
Location
Rajasthan, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Ajmer Nagaur State Highway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ajmer Nagaur State Highway” is an infrastructure initiative in the Automotive sector, located in Rajasthan, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On 23rd March 2012, the Government of Rajasthan (Public Works Department on behalf of Ministry of Road Transport and Highways (MoRTH), Government of India) awarded a 21 year concession (including construction period of 2 years) to GVR Infraprojects Limited (GVR) for the strengthening, improvement, two-laning, operation and maintenance, and tolling of 148.21kms Ajmer–Nagaur Section of NH-89, in the state of Rajasthan. Under the contract, GVR Infraprojects Limited was responsible for the design,construction, finance, operation and maintenance and widening of the existing carriageway to a two-lane highway with paved shoulders. The scope will include construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. The Government of India, Ministry of Road Transport and Highways (MORTH) through Public Works Department (PWD), Government of Rajasthan had decided to take up the development of various National Highway Corridors for augmentation of capacity for safe and efficient movement of traffic by widening to 2-lane with paved shoulder. Under this program, this project was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. GVR Infraprojects Limited established a special purpose vehicle, to implement the project. The SPV won the tender through international competitive bidding, conducted by PWD Rajasthan, by requesting the lowest fixed subsidy of US$ 9mn(INR 450mn @50 INR/USD). Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. The concession agreement was signed in November 2012. Details of financing were not available at the time of collection of this information. The estimated capital cost of the project at the time of bidding was US$ 75.4mn (INR 3771.5mn @50 INR/USD). Construction on the project was expected to begin in January 2013 and be completed by December 2014.

Original sector

Transport

Procurement method

Budget

Location

Country

India

State

Rajasthan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Bridge, Government, Road, Commercial, Waste Processing and Treatment

Article published date

2024-05-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project