logo

Akalla Tunnel Section for Stockholm Motorway Ring

Sector: Power Generation (CCGT) • Location: Stockholm, Sweden

Source: Highways Today

Project
Ongoing

STRABAG Sverige AB, a subsidiary of STRABAG SE, has been awarded a €45 million contract from the Swedish Transport Administration (Trafikverket) to build the Akalla Motorway Tunnel. The tunnel is part of the Stockholm Bypass, a motorway ring around the Swedish capital and currently the largest road construction and tunnelling project in the country. The order comprises the construction of two para

Project Information FAQ

Project Information

5 Q
The project “Akalla Tunnel Section for Stockholm Motorway Ring” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Stockholm, Sweden. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

STRABAG Sverige AB, a subsidiary of STRABAG SE, has been awarded a €45 million contract from the Swedish Transport Administration (Trafikverket) to build the Akalla Motorway Tunnel. The tunnel is part of the Stockholm Bypass, a motorway ring around the Swedish capital and currently the largest road construction and tunnelling project in the country. The order comprises the construction of two parallel tunnel bores including roadway with a total length of about 2.5 km (2 x 1.23 km) using conventional drilling and blasting as well as the necessary facilities for electricity, water and waste water. Injection systems will be used to further stabilise the rock. Construction is to begin in January 2018 and is scheduled for completion in June 2021.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data