AK/DOT: Gold Street Parking Garage Repairs
Sector: Cement • Location: Juneau, Alaska, United States of America
Source: Dodge USA
This state funded project includes corrosion removal with metal coating, patching, and painting; steel and concrete repairs and replacement; painted traffic/parking markings; electrical power, lighting, and signal repairs; and deck drain installation to extend the useful life of the parking garage at Second St & Gold St in Juneau, Alaska. The contract includes three (3) additive alternates for eac
- Status
- Closed
- Sector
- Cement, Commercial, Steel, Metal, Car parking, Automotive, Road, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Juneau, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about AK/DOT: Gold Street Parking Garage Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This state funded project includes corrosion removal with metal coating, patching, and painting; steel and concrete repairs and replacement; painted traffic/parking markings; electrical power, lighting, and signal repairs; and deck drain installation to extend the useful life of the parking garage at Second St & Gold St in Juneau, Alaska. The contract includes three (3) additive alternates for each of the following: cleaning and painting all exposed steel, patching and painting concrete mason... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Juneau |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Steel, Metal, Car parking, Automotive, Road, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
