AK/DOT: Parks Highway Culvert Replacement - Phase I
Bid results · Alaska · Last reported Feb 2025
Source: Dodge
This federally funded project will construct improvements for 10 culverts along the Parks Highway between Milepost 107 and Milepost 137. Project work includes culvert replacement, drainage improvements, ditch grading, paving, guardrail, signage, utility relocations, and striping.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Rail, Car parking, Road, Mass Transit, Automotive
- Location
- Wasilla, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AK/DOT: Parks Highway Culvert Replacement - Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This federally funded project will construct improvements for 10 culverts along the Parks Highway between Milepost 107 and Milepost 137. Project work includes culvert replacement, drainage improvements, ditch grading, paving, guardrail, signage, utility relocations, and striping. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Wasilla |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Rail, Car parking, Road, Mass Transit, Automotive |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
