AK/DOT: Parks Hwy Drainage & Culvert Improvements
Sector: Car parking • Location: Wasilla, Alaska, United States of America
Source: Dodge USA
Phase 1: Replace 10 culverts in critical condition that pose the highest risk to highway infrastructure if they fail. Design is currently underway to address these 10 culverts and is expected to be completed in late fall 2023. Phase 2: Replace the existing 144-inch culvert at Railroad Creek (MP 128.5) with a bridge. Design is currently underway and is expected to be completed in early 2024. Future
- Status
- Closed
- Sector
- Car parking, Rail, Bridge, Waste Processing and Treatment, Road, Water Supply and Storage, Automotive, Commercial, Raw Materials
- Location
- Wasilla, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about AK/DOT: Parks Hwy Drainage & Culvert Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1: Replace 10 culverts in critical condition that pose the highest risk to highway infrastructure if they fail. Design is currently underway to address these 10 culverts and is expected to be completed in late fall 2023. Phase 2: Replace the existing 144-inch culvert at Railroad Creek (MP 128.5) with a bridge. Design is currently underway and is expected to be completed in early 2024. Future Phases: Beginning in summer 2023, the project team will begin ranking roughly 70 of the remainin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Wasilla |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Rail, Bridge, Waste Processing and Treatment, Road, Water Supply and Storage, Automotive, Commercial, Raw Materials |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
