AK/DOT: Takotna River Bridge Replacement BDE
Sector: Water Supply and Storage • Location: Takotna, Alaska, United States of America
Source: Dodge
This federally funded contract is comprised of two projects. Project CFHWY00129-A will replace Takotna River Bridge No. 463. Project Z516210000-A will replace the Gold Creek Bridge with a large diameter culvert and replace the Tatalina River Bridge No. 462. Both projects also include grading, drainage, guardrail, and signing.
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Road, Waste Processing and Treatment, Bridge, Rail, Commercial
- Location
- Takotna, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AK/DOT: Takotna River Bridge Replacement BDE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This federally funded contract is comprised of two projects. Project CFHWY00129-A will replace Takotna River Bridge No. 463. Project Z516210000-A will replace the Gold Creek Bridge with a large diameter culvert and replace the Tatalina River Bridge No. 462. Both projects also include grading, drainage, guardrail, and signing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Takotna |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Road, Waste Processing and Treatment, Bridge, Rail, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
