AK/DOT: West Perimeter Road Improvements
Sector: Raw Materials • Location: Anchorage, Alaska, United States of America
Source: Dodge USA
ANC WEST PERIMETER ROAD . Construct a perimeter road along the northwest edge of the security fence. The road will begin just south of the fuel farm and continue around northwest to follow the existing security fence. Project includes structural section, paving, and security fencing.
- Status
- Closed
- Sector
- Raw Materials, Road, Commercial
- Location
- Anchorage, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about AK/DOT: West Perimeter Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ANC WEST PERIMETER ROAD . Construct a perimeter road along the northwest edge of the security fence. The road will begin just south of the fuel farm and continue around northwest to follow the existing security fence. Project includes structural section, paving, and security fencing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Anchorage |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Road, Commercial |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
