Aklavik Expansion of Solid Waste Site
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The project consists of expanding Aklavik’s 175 m x 95 m solid waste site. The project scope consists of adding 175 m of solid waste berms to increase capacity to house solid waste and diverted recyclable materials. The project will result in an increased capacity to divert and manage waste and recyclable material, as well as preventing land contamination. The volume of materials diverted is expec
- Status
- Under Construction
- Sector
- Biomass, Waste Processing and Treatment, Government
- Location
- Northwest Territories, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Aklavik Expansion of Solid Waste Site
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of expanding Aklavik’s 175 m x 95 m solid waste site. The project scope consists of adding 175 m of solid waste berms to increase capacity to house solid waste and diverted recyclable materials. The project will result in an increased capacity to divert and manage waste and recyclable material, as well as preventing land contamination. The volume of materials diverted is expected to increase from 0.0 to 50 tonnes/year and the capacity to dispose of materials is expected to increase from 100 to 9,000 tonnes/year. |
Original sector | Waste Management |
Budget |
Location
Country | Canada |
State | Northwest Territories |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Biomass, Waste Processing and Treatment, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in Canada
- Solid Waste Management Strategy
- BioExx Canola Oilseed and Protein Facility
- Enerkem Varennes Carbon Recycling
- Claresholm Solar Project Alberta
- Surrey Biofuel Processing Facility Project
- Florenceville-Bristol French Fry Plant Expansion, New Brunswick, Canada
- Aldersyde Bioenergy Facility
- Project Wheatland BioFuel Facility
