logo

Ako Battery Energy Storage System

Sector: Power Generation (CCGT) • Location: Hyogo Prefecture, Japan

Source: ESS News

Project
Planned

A 100 MW/400 MWh battery energy storage system (BESS) in Hyogo Prefecture, Kansai, Japan. Construction is to begin in the coming months following the notice to proceed, with completion expected in 2028. Neoen, Equans, and Toho have obtained a grid connection agreement with Kansai Electric Power Company.

Status
Prospective
Sector
Power Generation (CCGT), Energy Storage
Location
Hyogo Prefecture, Japan
Updated
22 Jul 2026
Source
ESS News

ConstructChat

Ask ConstructChat about Ako Battery Energy Storage System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Ako Battery Energy Storage System” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Hyogo Prefecture, Japan. Taiyo aggregates data on it from ESS News.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 100 MW/400 MWh battery energy storage system (BESS) in Hyogo Prefecture, Kansai, Japan. Construction is to begin in the coming months following the notice to proceed, with completion expected in 2028. Neoen, Equans, and Toho have obtained a grid connection agreement with Kansai Electric Power Company.

Original sector

Energy Storage

Location

Country

Japan

State

Hyogo Prefecture

Source

Source

ESS News

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Energy Storage

Article published date

2026-04-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project