Goynuk-Bolu was a 270MW lignite-fired power plant located in northwestern Turkey. Aksa Enerji is 81.22% owned by Kazanci Holding and 13.3% by Goldman Sachs Group (since April 2012, shares purchased for US$240 million). Kazanci Holding also own Aksa Elektrik.

Aksa Enerji, a privately-owned power producer received a 30-year license to build and operate the plant in March 2008. In the summer of 200

Project Information FAQ

Project Information

5 Q
The project “Aksa Goynuk/Bolu Coal Plant” is an infrastructure initiative in the Wind sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Goynuk-Bolu was a 270MW lignite-fired power plant located in northwestern Turkey. Aksa Enerji is 81.22% owned by Kazanci Holding and 13.3% by Goldman Sachs Group (since April 2012, shares purchased for US$240 million). Kazanci Holding also own Aksa Elektrik. Aksa Enerji, a privately-owned power producer received a 30-year license to build and operate the plant in March 2008. In the summer of 2009, it signed contracts for the supply of equipment with Slovakia's Slovenske Energeticke Strojarne (SES), and Skoda Power from the Czech Republic. SES was to supply two CFB boilers (350 t/hr). Sokda Power was to supply two 120MW steam turbines. The unit was commissioned for 2014 and 2015 for turbine 1 and 2 respectively. Construction started in July 2012. The project has a coal supply contract for 35 years, with Aksa Goynuk Energy, wholly-owned by Kazanci Holding. The concession was awarded by Turkish Coal Enterprises. Aksa Enerji secured a US$ 127 million long-term credit facility with a group of European Export-Import banks for the first unit, with a capacity of 135 MW, reported in October 2011. Construction started in June 2012. Commissioning of the first 135MW turbine was expected for October 2014. The second turbine was expected for commissioning in March 2015. In July 2012, total project cost was estimated at US$319 million. The project received a loan from Turkiye Is Bankasi & Turkiye Garanti Bankasi and Garanti Bank Internationl for US$240 million: US$120 million each, with 19 year tenor and 3 year grace period. The remainder was equity (75/25). The lenders legal advisor was Verdi de Yazici. Total investment was ESTIMATED at 270 MW x 1.3 million per MW (estimate), is $351 million. Aksa owns Aksa Enerji and Aksa Elektrik. Aksa Enerji is a distinct company, not to be confused with Aksu Enerji.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date