logo

Aksa Goynuk/Bolu Coal Plant

Sector: Commercial • Location: Turkey

Source: World Bank Group

Project
Active

Goynuk-Bolu was a 270MW lignite-fired power plant located in northwestern Turkey. Aksa Enerji is 81.22% owned by Kazanci Holding and 13.3% by Goldman Sachs Group (since April 2012, shares purchased for US$240 million). Kazanci Holding also own Aksa Elektrik.

Aksa Enerji, a privately-owned power producer received a 30-year license to build and operate the plant in March 2008. In the summer of 200

Status
Prospective
Sector
Commercial, Wind, Power Generation (CCGT), Manufacturing (Industrial), Government
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Aksa Goynuk/Bolu Coal Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Aksa Goynuk/Bolu Coal Plant” is an infrastructure initiative in the Commercial sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Goynuk-Bolu was a 270MW lignite-fired power plant located in northwestern Turkey. Aksa Enerji is 81.22% owned by Kazanci Holding and 13.3% by Goldman Sachs Group (since April 2012, shares purchased for US$240 million). Kazanci Holding also own Aksa Elektrik. Aksa Enerji, a privately-owned power producer received a 30-year license to build and operate the plant in March 2008. In the summer of 2009, it signed contracts for the supply of equipment with Slovakia's Slovenske Energeticke Strojarne (SES), and Skoda Power from the Czech Republic. SES was to supply two CFB boilers (350 t/hr). Sokda Power was to supply two 120MW steam turbines. The unit was commissioned for 2014 and 2015 for turbine 1 and 2 respectively. Construction started in July 2012. The project has a coal supply contract for 35 years, with Aksa Goynuk Energy, wholly-owned by Kazanci Holding. The concession was awarded by Turkish Coal Enterprises. Aksa Enerji secured a US$ 127 million long-term credit facility with a group of European Export-Import banks for the first unit, with a capacity of 135 MW, reported in October 2011. Construction started in June 2012. Commissioning of the first 135MW turbine was expected for October 2014. The second turbine was expected for commissioning in March 2015. In July 2012, total project cost was estimated at US$319 million. The project received a loan from Turkiye Is Bankasi & Turkiye Garanti Bankasi and Garanti Bank Internationl for US$240 million: US$120 million each, with 19 year tenor and 3 year grace period. The remainder was equity (75/25). The lenders legal advisor was Verdi de Yazici. Total investment was ESTIMATED at 270 MW x 1.3 million per MW (estimate), is $351 million. Aksa owns Aksa Enerji and Aksa Elektrik. Aksa Enerji is a distinct company, not to be confused with Aksu Enerji.

Original sector

Energy

Procurement method

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Power Generation (CCGT), Manufacturing (Industrial), Government

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project