logo

Aktobe District Heating

Sector: Water Supply and Storage • Location: Kazakhstan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Repaying

The EBRD is considering providing a senior loan of up to KZT 2.5 billion to Joint Stock Company “Transenergo” (the “Company”), a district heating company in the city of Aktobe, in Kazakhstan, to support the rehabilitation and upgrade of the district heating (DH) production facilities and distribution network in Aktobe.

	The project aims to rehabilitate and modernise the district heating producti

Project Information FAQ

Project Information

4 Q
The project “Aktobe District Heating” is an infrastructure initiative in the Water Supply and Storage sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EBRD is considering providing a senior loan of up to KZT 2.5 billion to Joint Stock Company “Transenergo” (the “Company”), a district heating company in the city of Aktobe, in Kazakhstan, to support the rehabilitation and upgrade of the district heating (DH) production facilities and distribution network in Aktobe. The project aims to rehabilitate and modernise the district heating production facilities and the main networks operated by the Company. This would resultin enhanced energy efficiency, reduction in technical and commercial losses and improvements in environmental standards. This project would deliver: (i) Energy efficiency improvements, including CO2 emission reductions, in the Company’s operations, through the modernisation of district heating production facilities and distribution network; (ii) Introduction of commercial tariffs in collaboration with the regulator, which will cover the full cost of service for all customer groups as agreed in the Priority Investment Programme and the commercialisation of the Company by means of a public service contract and business planning; (iii) Contribution to modern energy supply business practices through the demonstration of new replicable products and processes to manage district heating companies in Kazakhstan; iv) Higher environmental standards. Additionally, the transaction aims to increase transparency and improve business standards through the introduction of International Financial Reporting Standards (IFRS) and the implementation of an Environmental and Social Action Plan (ESAP). The expected transition impact rating is ‘good’. Joint Stock Company “Transenergo”, a municipally owned DH company in the city of Aktobe, Kazakhstan. Senior corporate loan to the Company in the amount of KZT 2.5 billion (€11.6 million equivalent). It is expected that the EBRD loan will be co-financed by a KZT 0.7 billion (€3.25 million equivalent) loan on concessionary terms from the Clean Technology Fund. KZT 4.07 billion. Categorised B in accordance with the EBRD’s Environmental and Social Policy (2008). Due diligence of the Project, consisting of an environmental and social analysis of the proposed investment and an environmental, health and safety audit of the existing operations and facilities of the Company, is in progress. The Project is expected to result in environmental improvements associated with the reduction in loss of water and heat, lower air emissions and increased energy efficiency. However, the Project might also be associated with increased noise and dust levels, generation and disposal of construction waste and wastewater during the construction phase. There might also be some disruptions of supply of heat and hot water to the community and restricted access to the residential areas during the excavation and pipe replacement works. Due diligence on the Project will need to be finalised and an environmental and social action plan agreed prior to the Final Review of the Project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data