logo
ProjectSigned

Aktobe Regional Roads

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

The European Bank for Reconstruction and Development (EBRD) is considering providing finance of up to USD 980 million co-financed on a 50/50 basis by AIIB in KZT, USD or JPY under sovereign guarantee to JSC KazAvtoZhol, 100 per cent state-owned national road operator. The loan proceeds will be used to finance an upgrade of a 234-km long road section between the cities of Aktobe and Ulgaisyn.

The

Status
Under Construction
Sector
Road, Raw Materials, Electric Vehicles (EVs), Residential, Automotive, Commercial, Government
Location
Kazakhstan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Aktobe Regional Roads

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Aktobe Regional Roads” is an infrastructure initiative in the Road sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The European Bank for Reconstruction and Development (EBRD) is considering providing finance of up to USD 980 million co-financed on a 50/50 basis by AIIB in KZT, USD or JPY under sovereign guarantee to JSC KazAvtoZhol, 100 per cent state-owned national road operator. The loan proceeds will be used to finance an upgrade of a 234-km long road section between the cities of Aktobe and Ulgaisyn. The proposed investments include the upgrade from 2- to 4-lanes, which the EBRD has assigned it a Category A, that means that a comprehensive Environmental and Social Impact Assessment (ESIA) and review of associated documents must be carried out, followed by their public disclosure for a minimum period of 120 days. 1. Environmental and Social Impact Assessment including Annexes in English, Kazakh and Russian (December 2024) 2. Non-Technical Summary (NTS) in English, Kazakh and Russian (December 2024) 3. Stakeholder Engagement Plan (SEP) in English, Kazakh and Russian (December 2024) 4. Environmental and Social Action Plan (ESAP) in English, Kazakh and Russian (December 2024) 5. Environmental and Social Management Plan (“ESMP”) in English, Kazakh and Russian (December 2024) 6. Resettlement Framework (RF) in English, Kazakh and Russian (December 2024) 7. Biodiversity Assessment Report (“BAR”) in English, Kazakh and Russian (December 2024) 8. Biodiversity Management Plan (“BMP”) in English, Kazakh and Russian (December 2024) 9. Road Safety Audit (“RSA”) in English, Kazakh and Russian (December 2024) Download zip package in English Download zip package in Kazakh Download zip package in Russian Full ESIA documentation is available locally at: Serik Imashev, Chief Engineer, JSC KazAutoZhol Phone: +7-777-038-11-11 Astana, Syganak str 60/4, 7th floor Email: serik.imashev@qaj.kz And EBRD Resident Office in Astana 16 Dostyk str., BC Talan Towers Offices 23rd floor 010000 Astana Kazakhstan Tel. +7 7172 554246 E-mail: EBRDastanainfo@ebrd.com And Website: https://ru.qaj.kz/news/novosti/1515/ Serik Imashev, Chief Engineer, JSC KazAutoZhol Phone: +7-777-038-11-11 Astana, Syganak str 60/4, 7th floor Email: serik.imashev@qaj.kz

Original sector

Transport

Procurement method

Location

Country

Kazakhstan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Raw Materials, Electric Vehicles (EVs), Residential, Automotive, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project