Aktobe Regional Roads
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
The European Bank for Reconstruction and Development (EBRD) is considering providing finance of up to USD 980 million co-financed on a 50/50 basis by AIIB in KZT, USD or JPY under sovereign guarantee to JSC KazAvtoZhol, 100 per cent state-owned national road operator. The loan proceeds will be used to finance an upgrade of a 234-km long road section between the cities of Aktobe and Ulgaisyn.
The
- Status
- Under Construction
- Sector
- Road, Raw Materials, Electric Vehicles (EVs), Residential, Automotive, Commercial, Government
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Aktobe Regional Roads
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The European Bank for Reconstruction and Development (EBRD) is considering providing finance of up to USD 980 million co-financed on a 50/50 basis by AIIB in KZT, USD or JPY under sovereign guarantee to JSC KazAvtoZhol, 100 per cent state-owned national road operator. The loan proceeds will be used to finance an upgrade of a 234-km long road section between the cities of Aktobe and Ulgaisyn. The proposed investments include the upgrade from 2- to 4-lanes, which the EBRD has assigned it a Category A, that means that a comprehensive Environmental and Social Impact Assessment (ESIA) and review of associated documents must be carried out, followed by their public disclosure for a minimum period of 120 days. 1. Environmental and Social Impact Assessment including Annexes in English, Kazakh and Russian (December 2024) 2. Non-Technical Summary (NTS) in English, Kazakh and Russian (December 2024) 3. Stakeholder Engagement Plan (SEP) in English, Kazakh and Russian (December 2024) 4. Environmental and Social Action Plan (ESAP) in English, Kazakh and Russian (December 2024) 5. Environmental and Social Management Plan (“ESMP”) in English, Kazakh and Russian (December 2024) 6. Resettlement Framework (RF) in English, Kazakh and Russian (December 2024) 7. Biodiversity Assessment Report (“BAR”) in English, Kazakh and Russian (December 2024) 8. Biodiversity Management Plan (“BMP”) in English, Kazakh and Russian (December 2024) 9. Road Safety Audit (“RSA”) in English, Kazakh and Russian (December 2024) Download zip package in English Download zip package in Kazakh Download zip package in Russian Full ESIA documentation is available locally at: Serik Imashev, Chief Engineer, JSC KazAutoZhol Phone: +7-777-038-11-11 Astana, Syganak str 60/4, 7th floor Email: serik.imashev@qaj.kz And EBRD Resident Office in Astana 16 Dostyk str., BC Talan Towers Offices 23rd floor 010000 Astana Kazakhstan Tel. +7 7172 554246 E-mail: EBRDastanainfo@ebrd.com And Website: https://ru.qaj.kz/news/novosti/1515/ Serik Imashev, Chief Engineer, JSC KazAutoZhol Phone: +7-777-038-11-11 Astana, Syganak str 60/4, 7th floor Email: serik.imashev@qaj.kz |
Original sector | Transport |
Procurement method |
Location
Country | Kazakhstan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Raw Materials, Electric Vehicles (EVs), Residential, Automotive, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
