Aktobe WWTP Modernisation
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
Provision of a sovereign-guaranteed loan of up to KZT 70.1 billion (equivalent EUR 140.3 million) (the “Loan”) for the benefit of the Aqtobe Su-Energy Group JSC (the “Company”), a city-owned company providing water supply, sewage and district heating services in Aqtobe city (the “City”), for major modernisation of the wastewater treatment plant (“WWTP”) and associated infrastructure (the “Project”
- Status
- Under Construction
- Sector
- Road, Water Supply and Storage, Telecommunications, Government, Power Generation (CCGT), Biomass, Residential, Waste Processing and Treatment, Commercial
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Aktobe WWTP Modernisation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provision of a sovereign-guaranteed loan of up to KZT 70.1 billion (equivalent EUR 140.3 million) (the “Loan”) for the benefit of the Aqtobe Su-Energy Group JSC (the “Company”), a city-owned company providing water supply, sewage and district heating services in Aqtobe city (the “City”), for major modernisation of the wastewater treatment plant (“WWTP”) and associated infrastructure (the “Project”). The Loan will be used to finance the following Project’s Priority Investment Programme (the “PIP”): (i) construction of a new WWTP with the capacity of 500,000 population equivalent (P.E.), including modernisation of a sewage pumping station; and (ii) construction of sludge treatment facilities, including anaerobic digestion unit and facility to produce heat and electricity from biogas generated by the anaerobic digestion. The Project will be implemented in line with the national and EU standards for urban wastewater treatment, EU requirements for sewage sludge management, EU BAT and EU taxonomy requirements for such facilities. Once implemented, the project will also lead to a reduced level of odour. The following documents are available in English, Kazakh and Russian for this project: 1. Environmental and Social Impact Assessment (“ESIA”), including Environmental and Social Management Plan (“ESMP”); 2. Non-Technical Summary (“NTS”); 3. Stakeholder Engagement Plan (“SEP”); 4. Environmental and Social Action Plan (“ESAP”). Download ZIP file of ESIA package in English Download ZIP file of ESIA package in Kazakh Download ZIP file of ESIA package in Russian Full ESIA documentation is available locally at: 1) Аqtobe Su-Energy Group JSC, 12B Sankibay Batyr Avenue, Aqtobe City, Kazakhstan; 2) EBRD Satellite Office in Aqtobe, 173/1 Sankibay Batyr Avenue, Progress Business Centre, office 301, Aqtobe City, Kazakhstan, +7 (7132) 703841; 3) EBRD Resident Office in Astana, 2 Dostyk Street, SAAD Business Center, 10th floor, Astana City, Kazakhstan, +7 (7172) 554246; 4) EBRD Resident Office in Almaty, 41 Kazybek Bi Street, Park Palace Business Centre, 3rd entrance, 3rd floor, Almaty City, Kazakhstan, +7 (7273) 320000; and Client website Environmental or social enquiries Ms Guldana Tolegenova, Ecologist email: pto@aqtobesuenergy.kz +7 (7132) 562772, www.aqtobesuenergy.kz General enquiries Аqtobe Su-Energy Group JSC, 2B Sankibay Batyr Avenue, Aqtobe City, Kazakhstan Tel.: +7 (7132) 562772 E-mail: office@aqtobesuenergy.kz Website: https://aqtobesuenergy.kz/ |
Original sector | Municipal Infrastructure |
Budget |
Location
Country | Kazakhstan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Telecommunications, Government, Power Generation (CCGT), Biomass, Residential, Waste Processing and Treatment, Commercial |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
