logo

Al Aweer Sewage Treatment Plant (STP) Upgrade, Dubai

Sector: Chemical (Industrial) • Location: World

Source: Water Technology

Project
Closed

The Dubai municipality initiated a major upgrade of the Al-Aweer sewage treatment plant in 2015. Image courtesy of ACWA Services Limited. Veolia Water Solutions &Technologies was selected as a distinguished supplier for the Al-Aweer upgrade in March 2015. Image courtesy of Veolia. The Al-Aweer sewage treatment plant was the first STP to be operational in Dubai. Image courtesy of Veolia. The muni

Project Information FAQ

Project Information

5 Q
The project “Al Aweer Sewage Treatment Plant (STP) Upgrade, Dubai” is an infrastructure initiative in the Chemical (Industrial) sector, located in World. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Dubai municipality initiated a major upgrade of the Al-Aweer sewage treatment plant in 2015. Image courtesy of ACWA Services Limited. Veolia Water Solutions &Technologies was selected as a distinguished supplier for the Al-Aweer upgrade in March 2015. Image courtesy of Veolia. The Al-Aweer sewage treatment plant was the first STP to be operational in Dubai. Image courtesy of Veolia. The municipality of Dubai announced plans to upgrade the Al-Aweer sewage treatment plant (STP) as part of its strategic plan 2015-2021. Based on the approved drainage and irrigation master plan, the Dubai municipality plans to upgrade existing STPs and enhance the performance of the entire sewerage system in the city. One of two wastewater treatment plants, the Al-Aweer STP’s upgrade will help make the city future-ready with the capacity to process an anticipated increase in sewage that would result from a rapidly increasing population. The AED144m ($39m) expansion will increase the plant’s capacity by 65,000m³ a day. Veolia subsidiary Veolia Water Solutions and Technologies was selected as a distinguished supplier for the project in March 2015. Under the contract, the company provides engineering, procurement, and construction services for the project. The Al-Aweer sewage treatment plant is located 25km away from the city centre and receives sewage from both domestic wastewater and septage. Optimal operation of the plant is essential for the city as it performs both tertiary wastewater treatment for irrigation reuse and sludge treatment for reuse as a soil fertiliser. The plant was initially designed with a capacity of 130,000m³ a day, which was later upgraded to 260,000m³ a day. The earlier expansion carried out by ACWA Services at the Al-Aweer STP included process additions, renovation to the existing facilities, facility modifications, testing, cleaning, calibration, and maintenance. In the preliminary treatment unit, minor modifications were made to the existing inlet chamber, yard piping modifications were made to bypass the existing inlet chamber, screening building was fitted with three travelling screens by replacing the existing ones, the existing aerate grit chambers were modified, and minor modifications were made to the pre-aeration tanks. Phase II of the Ganga Action Plan Project primarily involves the construction of a new 140,000m³/d sewage treatment plant (STP). Six new primary settling tanks and a new flow-splitting chamber were installed to uniformly distribute flow to the new settling tanks. A secondary biological treatment facility was also installed, which featured two new flow splitting chambers and three aeration tanks. Additional anoxic treatment facilities were added to improve the sludge setting characteristics. The tertiary biological treatment unit was installed with a flow-splitting chamber, a new big-filter recirculation pumping station, and two new tertiary settling tanks. The upgrade also included modifications to yard piping and replacement of biological filters. The existing pre-chlorinators and post-chlorinators were replaced with larger units, while chlorine storage facilities were modified to provide a safer operation and a new chlorine scrubber was installed to neutralise leaks. The sludge consolidation unit was installed with four new gravity sludge thickeners, and the consolidation system was modified to provide additional digester feed and centrifuge feed pumping capacity. A new polymer make-up and feed system was added, and dedicated odour exhaust fans were installed for each consolidation and holding tank. The existing dewatered sludge handling system was modified and a provision was created for additional high-solids centrifuges. A new air drying facility and sludge drying beds were also added to the sewage treatment plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data