Al Khoud Village Road Dual Carriageway
Sector: Road • Location: Oman
Source: Omanet
A 1.4 km dual carriageway on Al Khoud Village Road was inaugurated to support accessibility to the Oman Botanic Garden. The road features two lanes in each direction, pedestrian sidewalks, barrier railings, and surface water drainage systems. It extends 1.5 km connecting the Special Tasks Force Roundabout to the garden’s roundabout, enhancing traffic flow and infrastructure for the garden.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A 1.4 km dual carriageway on Al Khoud Village Road was inaugurated to support accessibility to the Oman Botanic Garden. The road features two lanes in each direction, pedestrian sidewalks, barrier railings, and surface water drainage systems. It extends 1.5 km connecting the Special Tasks Force Roundabout to the garden’s roundabout, enhancing traffic flow and infrastructure for the garden. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
